top of page
.jpg)

ZenBlog

Selecting Electrolyzer Capacity for a Green Hydrogen Plant.
By Sanjay Singhal | Vice President – Diversified Portfolio Editor: Sundy Srinivasan - COO Design and Layout: Adriana Gonzalez - Social...
Lerna Arias
Aug 13, 2024


Did you know that a Power Management System can have a significant influence on an equipment's sustainability?
By Sreekumar Vijayan - Sr. Electrical Engineer Editors: Ramesh Maini - CEO - President Design and Layout: Adriana Gonzalez - Social Media...
Lerna Arias
Aug 6, 2024

Did you know that many owners of assets have solved their headache of tank inspections?
By Sundy Srinivasan - COO Editor: Ravi Maini - Director: Operations & XR Solutions Design and Layout: Adriana Gonzalez - Social Media...
Lerna Arias
Jul 25, 2024


Going off Location Study for a Jack-Up Rig
During demobilization of jack-up rigs, when the rig’s legs are stuck in the seabed due to resistance from the surrounding soil, the hull...
Zentech
Jan 9, 2024


Validation of Wave Response Analysis for Jack-Up Rigs
For dynamically sensitive systems such as jack-up rigs, a dynamic analysis is performed to assess their structural response. In order of...
Zentech
Feb 3, 2022


Site Specific Assessment of Jack-up Rigs
Jack-Up rigs have traditionally been designed for Oil and Gas (O&G) drilling and production. At other times a jack-up has been used...
Zentech
Dec 27, 2021

bottom of page